“TPBS” / “TMM-ENERGOBUD MANAGEMENT LTD” produced and shipped systems of steam pipelines for Minsk TPP-3, in the project for the reconstruction of the power unit of the CCGT-325 MW. The total volume of the manufactured products was about 180 tons.
The products of TPBS / TMM-ENERGOBUD MANAGEMENT were manufactured and delivered within the scheduled time and are currently undergoing entrance control by the specialists of the station.